Last Day of Insulation Sale - Thursday, July 31
Last Day END OF MONTH SALE
Thursday, July 31
INSTALL GUIDES: Air ducts and water pipe (click for Installation Instructions)
Back to Install Methods | Print Friendly Version

Installing insulation on ductwork - Use: Prodex 48 Inch, 24 Inch, or 16 Inch.

Equipment checklist: Reflective tape, double sided tape , Super Metal Sealant, tape measure and utility knife.

Installation Instructions:

  1. Measure perimeter of ducts.
  2. Cut 2 inch strips out of the insulation rolls equal to the length of perimeter.
  3. Attach the insulation strips to the ducts with double sided tape or glue (Super Metal Sealant) every 16 inches.
  4. Attach the insulation to the strips with double sided tape or glue (Super Metal Sealant).
  5. Tape seams with reflective tape
  6. If applying a 2nd layer of insulation, repeat steps 1 - 5.

 

  • Will improve the energy efficiency of home
  • Ideal for air conditioning or heating duct
  • R-value not affected by moisture and water
  • Reduces noises and vibrations
  • Does not promote mold or mildew 
  • No allergenic or harmful content
  • Washable
  • Saves you money

Best Duct Insulation : Out Door DuctworkProdex Reviews

 

   
Official site of Prodex Total Insulation in USA and CAN © Copyright 2014, All Rights Reserved