CATHEDRAL CEILING METHOD #2

Installation Method:

 

  1. Secure the rigid insulation (optional) against the rafters or the existing ceiling (follow the manufacturers' recommendations).
  2. Install the wood strapping at every 16" c/c.
  3. Staple the Prodex and seal with aluminum tape.
  4. Install the second wood strapping perpendicular to the first one, and then screw the drywall.
If applying two layers of Prodex: Install a third strapping perpendicular to the 2nd. Staple the insulation and seal seams with tape. Attach 4th strapping perpendicular to third and screw the drywall. This will allow for an air-gap between layers of insulation and improve performance.
 
Insulation4LESS.com  Contact US

Bookmark This Page - Add to Favorites Insulation 4 LESS - The #1 Insulation Site Insulation 4 LESS - The #1 Insulation Site
PMB 138, 4833 Front St Ste B, Castle Rock, CO 80104 

© 2004-2012 Insulation4LESS.com, Inc.

  Click to verify BBB accreditation and to see a BBB report.
ABOUT SSL CERTIFICATES
 
© Copyright 2012, All Rights Reserved