Site Map  |  Contact  |  Home  
Insulation 4 Less - LOWEST-PRICE on reflective insulation! #1 site of contractors, builders, do-it-yourselfers, and metal building suppliers! Featuring Prodex - Over 2 Billion Square Feet SOLD World-wide
High R Insulation - Insulation 4 LESS
INSTALL GUIDES: CATHEDRAL CEILING METHOD #2
Back to Install Methods | Print Friendly Version
USE: Prodex Total, Prodex Fast Action
OR Foil-Bubble-Foil (FBF)
Be sure to have a ventilated airspace between the top of the insulation and the roof.

CATHEDRAL CEILING METHOD #2

Installation Method:

  1. Secure the rigid insulation (optional) against the rafters or the existing ceiling (follow the manufacturers' recommendations).
  2. Install the wood strapping at every 16" c/c.
  3. Staple the Prodex and seal with aluminum tape.
  4. Install the second wood strapping perpendicular to the first one, and then screw the drywall.
If applying two layers of Prodex: Install a third strapping perpendicular to the 2nd. Staple the insulation and seal seams with tape. Attach 4th strapping perpendicular to third and screw the drywall. This will allow for an air-gap between layers of insulation and improve performance.

Insulation4LESS.com Bookmark This Page - Add to Favorites Insulation 4 LESS - The #1 Insulation Site Drive Revenue - Become An Affiliate
PMB 138, 4833 Front St Ste B, Castle Rock, CO 80104-7901
Customers  |  Contact US  |  View Cart  |  Privacy
All orders should be submitted online.
We ship to all 50 US states and Canada. We have NAFTA certificate – You pay no duties!
© 2004-2009 Insulation 4 LESS   Warranty, Terms & Conditions
Site Certified Click to verify BBB accreditation and to see a BBB report. powered by
Orderstorm.com