INSTALL GUIDES: Cavity Wall for Metallic Studs in Commercial Buildings (click for Installation Instructions)
Back to Install Methods | Print Friendly Version

Use: Prodex 48 Inch, Fast Action, 72 Inch, 24 Inch, 16 Inch, Reflective Bubble Reflective or Foil Fiberglass Vinyl

  • Great R Value
  • Perfectly air tight system
  • Prevents heat losses 4 ways (conduction, convection, radiation and infiltration)
  • Also applicable for wood framed houses
CAVITY WALL FOR METALLIC STUDS IN COMMERCIAL BUILDINGS
Installation Method:

 

  1. The outside insulation and cladding must be done in the proper way.
  2. Stick the insulation to the metal studs with double faced tape. Just stick it temporarily prior to the installation of the metal strapping.
  3. Install the metal strapping and drywall following the manufacturer's recommendations
If applying 2nd layer of Prodex, be sure to use strapping between layers to create airspace.
Equipment Checklist:
QUICK INSTALL GUIDES - Equipment QUICK INSTALL GUIDES - Equipment QUICK INSTALL GUIDES - Equipment
 
Insulation4LESS.com  Contact US

Bookmark This Page - Add to Favorites Insulation 4 LESS - The #1 Insulation Site Insulation 4 LESS - The #1 Insulation Site
PMB 138, 4833 Front St Ste B, Castle Rock, CO 80104 

© 2004-2012 Insulation4LESS.com, Inc.

  Click to verify BBB accreditation and to see a BBB report.
ABOUT SSL CERTIFICATES
 
© Copyright 2012, All Rights Reserved