Insulation 4 Less - Prodex Total Insulation - Over 2 BILLION Square feet SOLD world wide! NEW! Prodex Fast Action with Tape - ORDER NOW!
Insulation 4 Less - LOWEST-PRICE on reflective insulation! #1 site of contractors, builders, do-it-yourselfers, and metal building suppliers!
PRODEX TOTAL Insulation - Insulation 4 LESS PRODEX TOTAL Insulation - Insulation 4 LESS
High R Insulation - Insulation 4 LESS
High R Insulation - Insulation 4 LESS
Foil-Fiberglass-Vinyl (FfgV)
Introducing Versi-Tab
Insulation4Less
    Tired of the constant builder-versus-erector debate about how to seal tabs? End the tab-sealing debate once and for all with Versi-Tab. Our new Versi-Tab stapling tab can be installed using the traditional “fold and staple” technique or the newer “lap tab” technique. Versi-Tab allows the installer to decide how to seal the seams, eliminating the potential that the material supplied to the jobsite doesn’t allow the erector to use his preferred installation method.

    Solarguard with Versi-Tab is manufactured with a 2” tab on one side of the Solarguard material and a 4” tab* on the other side. To install Solarguard with Versi-Tab using the “fold-and staple” technique, simply fold the 4” tab over the 2” tab and staple on 6” centers then fold again and staple again on 6” centers between the previously-applied staples. To install Solarguard with Versi-Tab using the “lap-tab” technique, simply lay the two rolls of Solarguard directly next to one another and let the 4” tab rest on top of the next roll of Solarguard (this means the 2” tab faces the building interior and the 4” tab is on the top side of the insulation, facing the roof). That’s it!

    Note: Tab widths are nominal. Actual tab width is approximately 1 ¾” and 3 ¾”

Insulation4Less

Recommended Versi-Tab Installation Techniques
Staple Tab

Draw the edge of the two adjoining rolls of Solarguard together and place the 4" tab directly adjacent to the 2” tab. You may want to apply a few staples on 18" to 24" centers to keep the joined tabs in position.


Fold the top half of the 4” tab over the 2” tab and staple 6” on center.


To complete the tab seal, fold tabs in half again and staple again 6” on center, between the previously-applied staples.

Lap Tab

Lay each roll in place with the 4” tab at the leading edge. As the next roll is placed, lift the 4” tab and slide the 2” tab from the new roll just beneath the previously-placed roll as shown above. When installation is complete, the 2" tab should be visible from the building interior and the 4" tab is above, facing the roof.
Insulation4Less

NEW! Prodex Fast Action with Tape - ORDER NOW!
SAVE TIME & MONEY!
Prodex Fast Action
Insulation w/ Adhesive Attached
ORDER NOW!
Bookmark This Page - Add to Favorites Insulation 4 LESS - The #1 Insulation Site Drive Revenue - Become An Affiliate Click to verify BBB accreditation and to see a BBB report.
Site Certified
Insulation4LESS.com PMB 138
4833 Front St Ste B
Castle Rock, CO 80104-7901
Customers  |  Contact US  |  VIEW CART
All orders should be submitted online.

Warranty, Terms & Conditions     Privacy
© 2004-2008 Insulation 4 LESS

Sign up for Email Updates of Specials
Email:

We ship to all 50 US states and Canada. We have NAFTA certificate – You pay no duties!

Insulation 4 LESS powered by Orderstorm.com