| Introducing Versi-Tab |
Solarguard with Versi-Tab is manufactured with a 2” tab on one side of the Solarguard material and a 4” tab* on the other side. To install Solarguard with Versi-Tab using the “fold-and staple” technique, simply fold the 4” tab over the 2” tab and staple on 6” centers then fold again and staple again on 6” centers between the previously-applied staples. To install Solarguard with Versi-Tab using the “lap-tab” technique, simply lay the two rolls of Solarguard directly next to one another and let the 4” tab rest on top of the next roll of Solarguard (this means the 2” tab faces the building interior and the 4” tab is on the top side of the insulation, facing the roof). That’s it! Note: Tab widths are nominal. Actual tab width is approximately 1 ¾” and 3 ¾” |
| Recommended Versi-Tab Installation Techniques | ||
Staple Tab![]() Draw the edge of the two adjoining rolls of Solarguard together and place the 4" tab directly adjacent to the 2” tab. You may want to apply a few staples on 18" to 24" centers to keep the joined tabs in position.
|
Lap Tab![]() Lay each roll in place with the 4” tab at the leading edge. As the next roll is placed, lift the 4” tab and slide the 2” tab from the new roll just beneath the previously-placed roll as shown above. When installation is complete, the 2" tab should be visible from the building interior and the 4" tab is above, facing the roof. |
|
![]() SAVE TIME & MONEY! Prodex Fast Action Insulation w/ Adhesive Attached ORDER NOW! |
![]() |
|
||
![]() |
PMB 138 4833 Front St Ste B Castle Rock, CO 80104-7901 Customers | Contact US | VIEW CART All orders should be submitted online. Warranty, Terms & Conditions Privacy
|
|||
powered by ![]() |